Wind Power

ACCIONA Windpower signs a new supply contract in brazil for 153 MW

Its 3 MW turbines will be used in the Santa Vitória do Palmar wind power complex owned by the company Atlantic Energias Renováveis.

Acciona
23/06/2014 15:36
ACCIONA Windpower signs a new supply contract in brazil for 153 MW Imagem: Acciona Visualizações: 1869 (0) (0) (0) (0)

Its 3 MW turbines will be used in the Santa Vitória do Palmar wind power complex owned by the company Atlantic Energias Renováveis.

AWP will also operate and maintain the turbines for 15 years.

ACCIONA Windpower (AWP), a subsidiary of the ACCIONA group that designs, manufactures and commercializes wind turbines, has signed a turbine supply contract in Brazil with the renewable energy generation holding company Atlantic Energias Renováveis for a total of 153 MW.

The contract includes the supply and assembly of fifty-one AW 125/3000 turbines, of 3 MW capacity each and 125 meters rotor diameter, for the Santa Vitória do Palmar wind power complex in the state of Río Grande do Sul. The turbines - the biggest designed by ACCIONA Windpower - will be mounted on 120-meter-high concrete towers.

The company has also signed a contract for the operation and maintenance of the turbines for a period of 15 years.

ACCIONA Windpower already has six supply contracts in Brazil for a total of 666 MW, making the country the company's biggest market in terms of 3 MW wind turbines.

A very competitive wind turbine

"The contracts with Atlantic strengthen our position in Brazil and confirm the special adaptability of our large AW3000 turbines to the characteristics of the wind power potential of the country", says ACCIONA Windpower Brasil Director Christiano Forman. "We have a very competitive machine, with options that make it ideal for a large number of sites".

ACCIONA Windpower complies with the requirements for local operation in Brazil defined in the FINAME regulation. It has an operational hub manufacture plant, which will be complemented with a nacelle factory in the fourth trimester of 2014. Both are located in the state of Bahia, and the supply of main turbine components such as blades is covered from local suppliers, as well as other smaller components.

 

Most Read Today
see see
OTC Brasil 2025
O&G exploration is key to social development and a just ...
28/10/25
OTC Brasil 2025
Experts warn regulatory instability threatens US$100 bil...
28/10/25
International Company News
Sercel Awarded Major Contract by ONGC to Supply Sercel 5...
28/10/25
Record
Petrobras announces production record of FPSO Almirante ...
28/10/25
OTC Brasil 2025
Event brings together global offshore industry leaders a...
28/10/25
OTC Brasil 2025
Petrobras participates in OTC Brasil 2025, in Rio de Janeiro
28/10/25
Petrobras
Petrobras produced 3.14 million barrels of oil equivalen...
27/10/25
FIRJAN
By 2035+, Rio de Janeiro State’s Energy Potential Could ...
23/10/25
Pre-Salt
PPSA to auction in December the first share of governmen...
23/10/25
Auction
Petrobras wins auction and leases RDJ07 terminal at the ...
23/10/25
Permanent Offer
Equinor acquires two new blocks in the Campos Basin duri...
23/10/25
OTC Brasil 2025
OTC Brasil 2025 Kicks Off in One Week with a Packed Prog...
22/10/25
Agreement
Wärtsilä Lifecycle agreement renewed to maintain safe, r...
22/10/25
Petrobras
Petrobras receives operating license for deepwater explo...
20/10/25
Equatorial Margin
License Grant for Drilling in the Equatorial Margin Is P...
20/10/25
Equatorial Margin
ABESPetro Statement on the Licensing of the Equatorial M...
20/10/25
Energy Transition
BNDES, Petrobras, and Finep select Valetec to manage the...
20/10/25
Pre-Salt
Petrobras and PPSA sign equalization agreement for Jubar...
20/10/25
WPC Energy Youth Forum
Kuwait to Host 8th WPC Energy Youth Forum in October 2025
20/10/25
Exports
Petrobras signs contract to sell six million barrels of ...
20/10/25
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.