Caspian Sea

BP starts oil production from West Chirag in Caspian Sea

The entire platform was fabricated in Azerbaijan.

BP
29/01/2014 19:25
Visualizações: 234 (0) (0) (0) (0)

 

BP says oil production has started from the new West Chirag platform in the Azeri sector of the Caspian Sea. The platform was commissioned for the $6-billion Chirag oil project in 2010 as part of the Azeri-Chirag-Gunashli (ACG) field development.
More than $4 billion was allocated to construction of facilities and the pre-drill program, and the remainder will be spent on platform development well drilling. The investment should help optimize recovery from the ACG field, BP adds. The entire platform was fabricated in Azerbaijan using local resources.
The West Chirag facility has been installed in around 170 m (558 ft) of water between the existing Chirag and Deepwater Gunashli platforms. Its oil-handling capacity is 183,000 b/d and its gas export capacity is 285 MMcf/d (8 MMcm/d).
Oil produced from the J05 well will be processed onboard and then exported to the Sangachal Terminal via a new infield pipeline linked to an existing 30-in. subsea export pipeline. Production will ramp up as the other pre-drilled wells are brought online.
Gordon Birrell, BP’s regional president for Azerbaijan, Georgia and Turkey, said: “West Chirag is the eighth world-class offshore platform that we have built and operated in a safe and efficient manner in the Caspian. To date the ACG field has produced over 2.3 Bbbl of oil and with future continual major investments in new technologies and facilities...it will continue to produce…for many decades.”
Partners in the ACG development are BP (operator – 35.8%), SOCAR (11.6%), Chevron (11.3%), INPEX (11%), Statoil (8.6%), ExxonMobil (8%), TPAO (6.8%), ITOCHU (4.3%), and ONGC Videsh (2.7%).

BP says oil production has started from the new West Chirag platform in the Azeri sector of the Caspian Sea. The platform was commissioned for the $6-billion Chirag oil project in 2010 as part of the Azeri-Chirag-Gunashli (ACG) field development.


More than $4 billion was allocated to construction of facilities and the pre-drill program, and the remainder will be spent on platform development well drilling. The investment should help optimize recovery from the ACG field, BP adds. The entire platform was fabricated in Azerbaijan using local resources.


The West Chirag facility has been installed in around 170 m (558 ft) of water between the existing Chirag and Deepwater Gunashli platforms. Its oil-handling capacity is 183,000 b/d and its gas export capacity is 285 MMcf/d (8 MMcm/d).


Oil produced from the J05 well will be processed onboard and then exported to the Sangachal Terminal via a new infield pipeline linked to an existing 30-in. subsea export pipeline. Production will ramp up as the other pre-drilled wells are brought online.


Gordon Birrell, BP’s regional president for Azerbaijan, Georgia and Turkey, said: “West Chirag is the eighth world-class offshore platform that we have built and operated in a safe and efficient manner in the Caspian. To date the ACG field has produced over 2.3 Bbbl of oil and with future continual major investments in new technologies and facilities...it will continue to produce…for many decades.”


Partners in the ACG development are BP (operator – 35.8%), SOCAR (11.6%), Chevron (11.3%), INPEX (11%), Statoil (8.6%), ExxonMobil (8%), TPAO (6.8%), ITOCHU (4.3%), and ONGC Videsh (2.7%).

 

Most Read Today
see see
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
Terminals
Vast announces contract extension with PETRONAS Brasil u...
15/07/26
International
War, oil and the dollar: how global fluctuations impact ...
13/07/26
ANP
Third-party access to natural gas flow pipelines and pro...
10/07/26
Agreement
ANP and Petrobras sign agreement to bring 335 offshore w...
07/07/26
Logistics
Vast Infraestrutura and Petrobras strengthen partnership...
07/07/26
IBP Positioning
Change of the instrument does not fix the illegalities o...
07/07/26
Energy Summit
Energy Summit 2026: Embrapii technologies strengthen Bra...
22/06/26
Energy Summit
Biodiesel and renewable fuels move to the center of the ...
22/06/26
Natural Gas
ANP extends public consultation on the calculation of th...
22/06/26
Rio de Janeiro
Firjan’s Oil Yearbook in Rio highlights that positive pr...
22/06/26
Biomethane
With a market five times larger since 2020, the biometha...
22/06/26
Petrobras
Petrobras approves investment in bio-jet fuel and renewa...
22/06/26
BOGE2026
Smart Control Gains Prominence at Bahia Oil & Gas Energy...
09/06/26
BOGE2026
Bahia Oil & Gas Energy Concludes Historic Edition and Se...
06/06/26
Branded Content
Boaventura Energy Complex drives Brazil’s energy future ...
06/06/26
BOGE2026
Mayekawa do Brasil present at Bahia Oil & Gas Energy
06/06/26
BOGE2026
Benel Marks Presence at Bahia Oil & Gas Energy and Annou...
02/06/26
BOGE2026
Bahiagás Highlights Bahia’s Leading Role in the Energy T...
30/05/26
Investments
Petrobras Announces Investments of More Than R$ 70 Billi...
30/05/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2