Projects

Foster Wheeler Receives Contract For CFB Steam Generator In South Korea

Commercial operation is scheduled for 2016.

Foster Wheeler
15/01/2014 13:10
Visualizações: 2843 (0) (0) (0) (0)

 

Foster Wheeler AG announced today that a subsidiary of its Global Power Group has been awarded a contract by eTEC E&C Limited for the design and supply of a circulating fluidized-bed (CFB) steam generator for the Seagull Cogeneration Plant Project. The project, owned by Gungjang Energy Co., Ltd., an affiliate of eTEC, is located in Gunsan City, South Korea.
Foster Wheeler has received a full notice to proceed on this contract. The terms of the agreement were not disclosed, and the contract value will be included in the company’s bookings for the fourth-quarter of 2013. Commercial operation of the new steam generator is scheduled for the middle of 2016.
Foster Wheeler will design and supply the 250 MWe (gross megawatt electric) steam generator including a selective catalytic reduction (SCR) system and provide technical advisory services during erection and commissioning. BHI Co., Ltd., a Foster Wheeler licensee, will provide local fabrication and sourcing to meet eTEC’s challenging delivery schedule. The CFB steam generator will be designed to burn Indonesian sub-bituminous coal while meeting applicable environmental regulatory requirements.
“We are pleased to have our innovative CFB technology selected again for the Korean market, converting economical solid fuels into valuable steam and power,” said Tomas Harju-Jeanty, Chief Executive Officer of Foster Wheeler Power Group Asia. “Our CFB steam generators give plant owners the flexibility to source fuel to take advantage of fuel pricing and market conditions.”
“We are confident with Foster Wheeler’s ability to provide a world-class CFB steam generator for our Seagull Cogeneration Plant which will demonstrate its advanced CFB technology within the Korean market,” said Mr. Woo Sun Lee, Executive Vice President of eTEC E&C. “We look forward to a successfully executed project with Foster Wheeler and BHI.”

Foster Wheeler AG announced today that a subsidiary of its Global Power Group has been awarded a contract by eTEC E&C Limited for the design and supply of a circulating fluidized-bed (CFB) steam generator for the Seagull Cogeneration Plant Project. The project, owned by Gungjang Energy Co., Ltd., an affiliate of eTEC, is located in Gunsan City, South Korea.


Foster Wheeler has received a full notice to proceed on this contract. The terms of the agreement were not disclosed, and the contract value will be included in the company’s bookings for the fourth-quarter of 2013. Commercial operation of the new steam generator is scheduled for the middle of 2016.


Foster Wheeler will design and supply the 250 MWe (gross megawatt electric) steam generator including a selective catalytic reduction (SCR) system and provide technical advisory services during erection and commissioning. BHI Co., Ltd., a Foster Wheeler licensee, will provide local fabrication and sourcing to meet eTEC’s challenging delivery schedule. The CFB steam generator will be designed to burn Indonesian sub-bituminous coal while meeting applicable environmental regulatory requirements.


“We are pleased to have our innovative CFB technology selected again for the Korean market, converting economical solid fuels into valuable steam and power,” said Tomas Harju-Jeanty, Chief Executive Officer of Foster Wheeler Power Group Asia. “Our CFB steam generators give plant owners the flexibility to source fuel to take advantage of fuel pricing and market conditions.”


“We are confident with Foster Wheeler’s ability to provide a world-class CFB steam generator for our Seagull Cogeneration Plant which will demonstrate its advanced CFB technology within the Korean market,” said Mr. Woo Sun Lee, Executive Vice President of eTEC E&C. “We look forward to a successfully executed project with Foster Wheeler and BHI.”

Most Read Today
see see
FIRJAN
Agrega + Indústria brings together entities, companies, ...
29/07/26
SOG 2026
ABPIP brings to Sergipe Oil & Gas a debate on strengthen...
28/07/26
Event
BR Aviation presents its portfolio of customized solutio...
23/07/26
Royalties
Royalties: amounts referring to May production distribut...
23/07/26
Fuels
Fuel and lubricants sector registers 1.8% drop in June, ...
22/07/26
IBP
Studies point to redundancy of the export tax and extra ...
22/07/26
PPSA
7th Spot Auction: PPSA markets cargoes from Atapu and Ba...
20/07/26
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
Terminals
Vast announces contract extension with PETRONAS Brasil u...
15/07/26
International
War, oil and the dollar: how global fluctuations impact ...
13/07/26
ANP
Third-party access to natural gas flow pipelines and pro...
10/07/26
Agreement
ANP and Petrobras sign agreement to bring 335 offshore w...
07/07/26
Logistics
Vast Infraestrutura and Petrobras strengthen partnership...
07/07/26
IBP Positioning
Change of the instrument does not fix the illegalities o...
07/07/26
Energy Summit
Energy Summit 2026: Embrapii technologies strengthen Bra...
22/06/26
Energy Summit
Biodiesel and renewable fuels move to the center of the ...
22/06/26
Natural Gas
ANP extends public consultation on the calculation of th...
22/06/26
Rio de Janeiro
Firjan’s Oil Yearbook in Rio highlights that positive pr...
22/06/26
Biomethane
With a market five times larger since 2020, the biometha...
22/06/26
Petrobras
Petrobras approves investment in bio-jet fuel and renewa...
22/06/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.