Business

FoundOcean wins contracts to secure Solan foundations

The pipeline damage resulted from an anchor drag during bad weather.

FoundOcean
14/04/2014 21:37
Visualizações: 2975 (0) (0) (0) (0)

 

FoundOcean has completed installation and grouting for a clamp repair on an 18-in. pipeline in the Gulf of Mexico under contract from Saipem America.
The seabed a water depth of 750 m (2,460 ft) was dredged at around the damaged area of the pipeline. An ROV maneuvered the two steel half-shells of the clamp into position and pre-tightened the bolts. FoundOcean then connected the hose to the inlet valve on the clamp and delivered the grout using its deepwater grouting umbilical system. Due to the extra load, a fabric formwork was installed under the clamp to provide more support.
In total 28 metric tons (30.86 tons) of cement was used: 4 metric tons (4.4 tons) for the clamp and 24 metric tons (26.46 tons) for the fabric formwork.
The pipeline damage resulted from an anchor drag during bad weather.

FoundOcean has completed installation and grouting for a clamp repair on an 18-in. pipeline in the Gulf of Mexico under contract from Saipem America.


The seabed a water depth of 750 m (2,460 ft) was dredged at around the damaged area of the pipeline. An ROV maneuvered the two steel half-shells of the clamp into position and pre-tightened the bolts. FoundOcean then connected the hose to the inlet valve on the clamp and delivered the grout using its deepwater grouting umbilical system. Due to the extra load, a fabric formwork was installed under the clamp to provide more support.


In total 28 metric tons (30.86 tons) of cement was used: 4 metric tons (4.4 tons) for the clamp and 24 metric tons (26.46 tons) for the fabric formwork.


The pipeline damage resulted from an anchor drag during bad weather.

Most Read Today
see see
Offshore Technology & Subsea Engineering
Trendsetter Vulcan Offshore Customizes Tethered BOP Tech...
17/03/26
Macaé Energy
FIRJAN: Technical Conference is a Highlight of Macaé Ene...
16/03/26
Permanent Offer
Inclusion of 15 New Blocks in Permanent Offer (OPP) Bid ...
14/03/26
Rio de Janeiro
Rio City Hall Signs Agreement to Transfer Automóvel Club...
13/03/26
Result
Porto do Açu Sets Historic Record in Cargo Handling
13/03/26
Environment
Following COP30, IBP Organizes Meeting to Debate Brazil'...
13/03/26
Jet Fuel
Resolution Approved to Revise Aviation Kerosene Quality ...
13/03/26
Biofuels
ANP to Participate in Research Project on Increasing Bio...
13/03/26
Results
Petrobras Paid R$ 277.6 Billion in Taxes and Government ...
13/03/26
North Sea
Two new discoveries in the North Sea
11/03/26
Macaé Energy
At Macaé Energy 2026, FIRJAN Promotes Special Edition of...
09/03/26
iBEM26
Innovation, ESG, and Sustainability
06/03/26
iBEM26
Artificial Intelligence drives increased demand for elec...
02/03/26
FIRJAN
Despite Tariff Hikes, Oil Drives Rio's Trade Flow Up 9% ...
27/02/26
Royalties
December Production Royalty Payments Distributed to Stat...
26/02/26
Award
BRAVA Energia Wins Top Honor at OTC Houston for Atlanta ...
26/02/26
Strategic Agenda
ABPIP Presents 2026 Strategic Agenda to Chairman of the ...
26/02/26
People
TVO Enhances Project Management Expertise
26/02/26
Memorandum of Understanding
Wärtsilä and Abu Dhabi Maritime Academy explore collabor...
12/02/26
Pre-Salt
Petrobras platform P-79 arrives at the Búzios field
12/02/26
Results
Petrobras’ oil and gas production rises 11% and reaches ...
12/02/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.