Business

FoundOcean wins contracts to secure Solan foundations

The pipeline damage resulted from an anchor drag during bad weather.

FoundOcean
14/04/2014 21:37
Visualizações: 2411 (0) (0) (0) (0)

 

FoundOcean has completed installation and grouting for a clamp repair on an 18-in. pipeline in the Gulf of Mexico under contract from Saipem America.
The seabed a water depth of 750 m (2,460 ft) was dredged at around the damaged area of the pipeline. An ROV maneuvered the two steel half-shells of the clamp into position and pre-tightened the bolts. FoundOcean then connected the hose to the inlet valve on the clamp and delivered the grout using its deepwater grouting umbilical system. Due to the extra load, a fabric formwork was installed under the clamp to provide more support.
In total 28 metric tons (30.86 tons) of cement was used: 4 metric tons (4.4 tons) for the clamp and 24 metric tons (26.46 tons) for the fabric formwork.
The pipeline damage resulted from an anchor drag during bad weather.

FoundOcean has completed installation and grouting for a clamp repair on an 18-in. pipeline in the Gulf of Mexico under contract from Saipem America.


The seabed a water depth of 750 m (2,460 ft) was dredged at around the damaged area of the pipeline. An ROV maneuvered the two steel half-shells of the clamp into position and pre-tightened the bolts. FoundOcean then connected the hose to the inlet valve on the clamp and delivered the grout using its deepwater grouting umbilical system. Due to the extra load, a fabric formwork was installed under the clamp to provide more support.


In total 28 metric tons (30.86 tons) of cement was used: 4 metric tons (4.4 tons) for the clamp and 24 metric tons (26.46 tons) for the fabric formwork.


The pipeline damage resulted from an anchor drag during bad weather.

Most Read Today
see see
OTC Brasil 2025
Petrobras participates in OTC Brasil 2025, in Rio de Janeiro
28/10/25
Petrobras
Petrobras produced 3.14 million barrels of oil equivalen...
27/10/25
FIRJAN
By 2035+, Rio de Janeiro State’s Energy Potential Could ...
23/10/25
Pre-Salt
PPSA to auction in December the first share of governmen...
23/10/25
Auction
Petrobras wins auction and leases RDJ07 terminal at the ...
23/10/25
Permanent Offer
Equinor acquires two new blocks in the Campos Basin duri...
23/10/25
OTC Brasil 2025
OTC Brasil 2025 Kicks Off in One Week with a Packed Prog...
22/10/25
Agreement
Wärtsilä Lifecycle agreement renewed to maintain safe, r...
22/10/25
Petrobras
Petrobras receives operating license for deepwater explo...
20/10/25
Equatorial Margin
License Grant for Drilling in the Equatorial Margin Is P...
20/10/25
Equatorial Margin
ABESPetro Statement on the Licensing of the Equatorial M...
20/10/25
Energy Transition
BNDES, Petrobras, and Finep select Valetec to manage the...
20/10/25
Pre-Salt
Petrobras and PPSA sign equalization agreement for Jubar...
20/10/25
WPC Energy Youth Forum
Kuwait to Host 8th WPC Energy Youth Forum in October 2025
20/10/25
Exports
Petrobras signs contract to sell six million barrels of ...
20/10/25
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.