Pre-Salt

FPSO P-78 arrives at the Búzios Field

The platform was towed to the site with the crew onboard, a strategy that allows for an earlier start of production and enhances operational reliability throughout the commissioning phase.

Petrobras Agency
01/10/2025 17:50
FPSO P-78 arrives at the Búzios Field Imagem: Petrobras Agency Visualizações: 124 (0) (0) (0) (0)

After departing the Benoi shipyard in Singapore on July 13th, the FPSO P-78 arrived today, September 30th, at the Búzios Field, in the pre-salt layer of the Santos Basin. The unit will now be connected to the wells to begin production shortly.

The Búzios Field is located in ultra-deep waters of the Santos Basin at depths of up to 2,100 meters, 180 km off the coast of Rio de Janeiro state. The Búzios 6 project involves 13 wells: 6 producers (with 2 convertible to injectors), 6 Water Alternating Gas (WAG) injectors, and 1 gas injector. The unit will be interlinked with rigid pipelines for production, injection, and gas export, as well as flexible pipelines for service lines and gas lift.

The FPSO P-78 is the seventh unit planned for the field and will join six other platforms currently in operation: FPSOs P-74, P-75, P-76, P-77, Almirante Barroso, and Almirante Tamandaré. The P-78 has a production capacity of 180,000 barrels of oil per day (bopd), in addition to compressing 7.2 million cubic meters (m3) of gas daily.

Transporting the unit with the crew onboard allows production to begin approximately two weeks earlier than the traditional approach of stopping in sheltered waters. Moving the FPSO manned enables several complex systems to remain operational, ensuring continuity of commissioning activities and team training on these systems. This approach significantly reduces the time between the unit's arrival at the field and the start of oil production. Following arrival and prior to entering service, anchoring operations and connection of the platform to the producing wells will be carried out, a process expected to take about two months.

The hull was constructed at shipyards in Yantai and Hayang, China, and Ulsan, South Korea, where the blocks were also integrated. The FPSO was then transported to a shipyard in Singapore, where the topside modules built in Brazil (at the Seatrium Angra dos Reis Shipyard, formerly Brasfels), China, and Singapore were integrated and commissioned.

"The P-78 joins the other production units to further boost production at the Búzios Field, which has already surpassed a daily output of 900,000 barrels of oil," said Sylvia Anjos, Director of Exploration and Production.

According to Renata Baruzzi, Director of Engineering, Technology, and Innovation, "The compliance with the scheduled timeline for the platform's completion reinforces the importance of integrated management of our projects."

Most Read Today
see see
Campos Basin
Petrobras announces Approval of the Production Individua...
23/07/25
ADIPEC 2025
ADIPEC 2025 Technical Conferences achieve record submiss...
22/07/25
People
BCCK names Andres Martinez as business development manager
21/07/25
Fenasucro
Brazil Holds Global Leadership in Renewable Cogeneration...
21/07/25
Results
Revap Achieves Historic Records in H1 with S10 Diesel an...
21/07/25
Solar Energy
Transpetro Inaugurates Solar Plant to Supply the Belém T...
21/07/25
Company News
Strohm completes successful field trials for Petrobras
16/07/25
Natural Gas
Gasmig: 39 Years of Energy, Innovation, and Commitment t...
16/07/25
Sustainability
Foresea earns Social Seal and reports significant result...
11/07/25
Results
Oil and Gas Sector Leads Dividend Distribution in 2024 w...
10/07/25
Natural Gas
Comgás Receives 41 Proposals in Public Call for Natural ...
10/07/25
People
Lucas Mota de Lima Appointed Executive Manager of ABPIP
10/07/25
Biomethane
Presidente Prudente (SP) Begins R$12 Million Biomethane ...
10/07/25
E&P
Hitachi Energy to evaluate electrification of offshore p...
10/07/25
Digitalization
TGS and Equinor Collaborate to Drive Digital Transformat...
10/07/25
People
Julia Cruz Appointed as New Secretary of Green Economy, ...
03/07/25
Sustainability
ABB among TIME’s World’s Most Sustainable Companies
03/07/25
Biofuels
Brazil Can Lead the Decarbonization of International Tra...
03/07/25
Pre-Salt
Oil States signs contracts to supply rigid jumpers for S...
03/07/25
Electric Energy
SMEs: Seven Tips for Joining the Free Energy Market
03/07/25
Energy Transition
CCEE Highlights Leadership in Energy Transition at EVEX ...
03/07/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2