Russia

Lukoil Starts Production Drilling at Imilorsko-Istochniy

The original plan had been to begin production drilling in September.

Lukoil
25/02/2014 14:35
Visualizações: 225 (0) (0) (0) (0)

 

Lukoil announced Tuesday that it has started production drilling at the Imilorsko-Istochniy license area in the Khanty-Mansi autonomous district in central Russia.
The firm said that the start of drilling has put it "considerably ahead of schedule" in the implementation of its "Early Oil" project on the license area. The original plan had been to begin production drilling at the site in September 2014, and Lukoil expects to lift its first oil from the project ahead of schedule as well.
So far, 14 miles of oil pipelines, 26 miles of roads and a 240-foot bridge across the Entl-Imiyagun River have been constructed, and four well pads are under development. 3D seismic data has also been collected over an area exceeding 575 square miles.
Lukoil said that, for purposes of follow-up exploration and study of the Imilorsko-Istochniy license area in the coming years, additional seismic surveys will be performed at the site, 20 historic wildcat wells will be retested and 11 new wildcat wells will be drilled. Lukoil added that C1 and C2 recoverable reserves estimated within the license area total 855 million tons and 193 million tons of oil respectively (or 6.2 billion barrels and 1.4 billion barrels).

Lukoil announced Tuesday that it has started production drilling at the Imilorsko-Istochniy license area in the Khanty-Mansi autonomous district in central Russia. The firm said that the start of drilling has put it "considerably ahead of schedule" in the implementation of its "Early Oil" project on the license area. The original plan had been to begin production drilling at the site in September 2014, and Lukoil expects to lift its first oil from the project ahead of schedule as well.


So far, 14 miles of oil pipelines, 26 miles of roads and a 240-foot bridge across the Entl-Imiyagun River have been constructed, and four well pads are under development. 3D seismic data has also been collected over an area exceeding 575 square miles.


Lukoil said that, for purposes of follow-up exploration and study of the Imilorsko-Istochniy license area in the coming years, additional seismic surveys will be performed at the site, 20 historic wildcat wells will be retested and 11 new wildcat wells will be drilled. Lukoil added that C1 and C2 recoverable reserves estimated within the license area total 855 million tons and 193 million tons of oil respectively (or 6.2 billion barrels and 1.4 billion barrels).

 

Most Read Today
see see
Royalties
Royalties: amounts referring to May production distribut...
23/07/26
Fuels
Fuel and lubricants sector registers 1.8% drop in June, ...
22/07/26
IBP
Studies point to redundancy of the export tax and extra ...
22/07/26
PPSA
7th Spot Auction: PPSA markets cargoes from Atapu and Ba...
20/07/26
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
Terminals
Vast announces contract extension with PETRONAS Brasil u...
15/07/26
International
War, oil and the dollar: how global fluctuations impact ...
13/07/26
ANP
Third-party access to natural gas flow pipelines and pro...
10/07/26
Agreement
ANP and Petrobras sign agreement to bring 335 offshore w...
07/07/26
Logistics
Vast Infraestrutura and Petrobras strengthen partnership...
07/07/26
IBP Positioning
Change of the instrument does not fix the illegalities o...
07/07/26
Energy Summit
Energy Summit 2026: Embrapii technologies strengthen Bra...
22/06/26
Energy Summit
Biodiesel and renewable fuels move to the center of the ...
22/06/26
Natural Gas
ANP extends public consultation on the calculation of th...
22/06/26
Rio de Janeiro
Firjan’s Oil Yearbook in Rio highlights that positive pr...
22/06/26
Biomethane
With a market five times larger since 2020, the biometha...
22/06/26
Petrobras
Petrobras approves investment in bio-jet fuel and renewa...
22/06/26
BOGE2026
Smart Control Gains Prominence at Bahia Oil & Gas Energy...
09/06/26
BOGE2026
Bahia Oil & Gas Energy Concludes Historic Edition and Se...
06/06/26
Branded Content
Boaventura Energy Complex drives Brazil’s energy future ...
06/06/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.