Australia

UTEC Secures Ichthys Contract

The contract was awarded to UTEC by Saipem.

UTEC Survey
08/04/2014 15:09
Visualizações: 237 (0) (0) (0) (0)

 

UTEC Survey (Australia) said that it has been awarded a pipelay support survey and positioning contract in Australia.
The contract was awarded to UTEC by Saipem and involves the provision of offshore survey and positioning services during the pre-lay, lay and post-lay installation of a 42-inch-diameter, 889 kilometre long pipeline which will connect the Ichthys LNG Project’s offshore central processing facility situated some 200km off the coast of Western Australia with its onshore gas processing plant near Darwin in Australia’s Northern Territory.
To be installed in water depths up to 275 meters, the pipeline is the longest subsea gas pipeline in the Southern hemisphere and the fifth longest in the world.
Offshore activity will commence in May 2014 and it will see UTEC providing survey and positioning services on a range of Saipem-owned and chartered vessels. Pre-lay survey works will be carried out from the Go Explorer, which will also provide touch-down monitoring support to the pipelay barges. The Semac-1 will start pipelay at the Darwin end and lay approximately 150km of the 42-inch pipe before Saipem’s fourth generation pipelay vessel Castorone takes over to complete the pipelay out to the Ichthys field.

UTEC Survey (Australia) said that it has been awarded a pipelay support survey and positioning contract in Australia. The contract was awarded to UTEC by Saipem and involves the provision of offshore survey and positioning services during the pre-lay, lay and post-lay installation of a 42-inch-diameter, 889 kilometre long pipeline which will connect the Ichthys LNG Project’s offshore central processing facility situated some 200km off the coast of Western Australia with its onshore gas processing plant near Darwin in Australia’s Northern Territory.


To be installed in water depths up to 275 meters, the pipeline is the longest subsea gas pipeline in the Southern hemisphere and the fifth longest in the world.


Offshore activity will commence in May 2014 and it will see UTEC providing survey and positioning services on a range of Saipem-owned and chartered vessels. Pre-lay survey works will be carried out from the Go Explorer, which will also provide touch-down monitoring support to the pipelay barges. The Semac-1 will start pipelay at the Darwin end and lay approximately 150km of the 42-inch pipe before Saipem’s fourth generation pipelay vessel Castorone takes over to complete the pipelay out to the Ichthys field.

 

Most Read Today
see see
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
Terminals
Vast announces contract extension with PETRONAS Brasil u...
15/07/26
International
War, oil and the dollar: how global fluctuations impact ...
13/07/26
ANP
Third-party access to natural gas flow pipelines and pro...
10/07/26
Agreement
ANP and Petrobras sign agreement to bring 335 offshore w...
07/07/26
Logistics
Vast Infraestrutura and Petrobras strengthen partnership...
07/07/26
IBP Positioning
Change of the instrument does not fix the illegalities o...
07/07/26
Energy Summit
Energy Summit 2026: Embrapii technologies strengthen Bra...
22/06/26
Energy Summit
Biodiesel and renewable fuels move to the center of the ...
22/06/26
Natural Gas
ANP extends public consultation on the calculation of th...
22/06/26
Rio de Janeiro
Firjan’s Oil Yearbook in Rio highlights that positive pr...
22/06/26
Biomethane
With a market five times larger since 2020, the biometha...
22/06/26
Petrobras
Petrobras approves investment in bio-jet fuel and renewa...
22/06/26
BOGE2026
Smart Control Gains Prominence at Bahia Oil & Gas Energy...
09/06/26
BOGE2026
Bahia Oil & Gas Energy Concludes Historic Edition and Se...
06/06/26
Branded Content
Boaventura Energy Complex drives Brazil’s energy future ...
06/06/26
BOGE2026
Mayekawa do Brasil present at Bahia Oil & Gas Energy
06/06/26
BOGE2026
Benel Marks Presence at Bahia Oil & Gas Energy and Annou...
02/06/26
BOGE2026
Bahiagás Highlights Bahia’s Leading Role in the Energy T...
30/05/26
Investments
Petrobras Announces Investments of More Than R$ 70 Billi...
30/05/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2