OTC Houston 2019

Baker Hughes, a GE company Wins Turbomachinery Contract for BP’s Greater Tortue Ahmeyim FLNG Development

Press Release
08/05/2019 18:01
Visualizações: 301 (0) (0) (0) (0)

Baker Hughes, a GE company announced (May 6) that it has been awarded a contract to supply turbomachinery equipment for the first phase of BP’s Greater Tortue Ahmeyim floating liquefied natural gas (FLNG) project located offshore Mauritania and Senegal. BHGE will provide the technology for four compressor trains for offshore gas liquefaction on board Golar LNG Limited’s industry leading FLNG solution, expected to deliver 2.5 million tonnes of LNG per annum.

 

The contract was awarded to BHGE in the first quarter of 2019 by Golar’s topsides contractor, Black and Veatch (B&V). The award builds on a separate subsea production contract also received by BHGE in the first quarter for the Project, demonstrating the strength and breadth of the company’s fullstream portfolio for offshore gas fields.

 

Each of the four trains will consist of a PGT25+G4 aeroderivative gas turbine driving a centrifugal compressor. This solution was designed, tested and proven based on a model that B&V and BHGE developed together previously for a similar application . The gas turbines and compressors will be manufactured, tested and transported from BHGE’s plants in Italy.

 

“Being selected for this important project reinforces our gas leadership position in the global LNG market and an important region,” said Rod Christie, President and CEO of BHGE Turbomachinery & Process Solutions. “Our technology solution has been proven to support FLNG, is based on a strong partnership with B&V and offers best-in-class reliability rates that will help reduce operational risks for Golar and BP.”

 

Technology Details 

The PGT25+ G4 gas turbine family has over 560 units in operation, with more than 3.7 million of fired hours of operating experience. First introduced in the mid 2000’s, the PGT25+ G4 builds on the LM2500 and PGT25 heritage, which has over 2500 engines in service and has accumulated more than 94 million hours of operation with best-in-class reliability and availability.

 

Project Details 

The initial subsea infrastructure connects the first four of 12 wells consolidated through production pipelines leading to a floating production, storage, and offloading (FPSO) vessel. From here liquids are removed and the export gas is transported via a pipeline to the FLNG hub terminal where the gas is liquefied.

 

The Greater Tortue Ahmeyim project will produce gas from an ultra-deepwater subsea system and mid-water floating production, storage and offloading (FPSO) vessel, which will process the gas and remove heavier hydrocarbon components. The gas will then be transferred to a floating liquefied natural gas (FLNG) facility at an innovative nearshore hub located on the Mauritania and Senegal maritime border. The FLNG facility is designed to provide circa 2.5 million tonnes of LNG per annum on average, with the total gas resources in the field estimated to be around 15 trillion cubic feet. The project, the first major gas development to reach FID in the basin, is planned to provide LNG for global export as well as making gas available for domestic use in both Mauritania and Senegal.

Most Read Today
see see
IBP
Brazil Can Expand Its Prominence as a Global Energy Supp...
27/05/26
Investments
Petrobras and Transpetro announce R$ 2.8 billion in inve...
27/05/26
International Company News
Jumbo orders a new class of versatile heavy lift vessels
27/05/26
BOGE2026
The Largest Oil and Gas Event in the North and Northeast...
25/05/26
BOGE2026
With production on the rise, independent players lead di...
25/05/26
ANP
ANP Workshop Debates Boosting Oil and Gas Exploration in...
25/05/26
BOGE2026
ANP participates in Bahia Oil & Gas Energy 2026, in Salvador
25/05/26
Fenasucro
Future Fuel consolidates Brazilian pioneering role and b...
20/05/26
Partnership
Radix partners with Repsol Sinopec Brasil and PUCRS to c...
20/05/26
Communication
The behind-the-scenes story of communication and adverti...
20/05/26
Result
Total oil production under production-sharing regime hit...
20/05/26
BOGE2026
Global geopolitics’ impact on the local oil sector to be...
19/05/26
International Women's Day
IBP celebrates International Women at Sea Day and reinfo...
19/05/26
Pre-Salt
Mero Field in the Santos Basin Pre-Salt Receives Unprece...
14/05/26
Results
Petrobras reports net profit of R$ 32.7 billion in the f...
14/05/26
Partnership
Halliburton and Shape Digital establish strategic collab...
06/05/26
ROG.e 2026
ROG.e 2026 will bring together CEOs from TotalEnergies, ...
06/05/26
International
At OTC Houston 2026, Firjan SENAI SESI expands its reach...
06/05/26
International
At OTC Houston 2026, Firjan SENAI holds international ed...
04/05/26
Recognition
BRAVA Energia receives top global industry award for Atl...
04/05/26
International
Brazil reaffirms technological leadership at OTC Houston...
04/05/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2