Solar Power

Brazil Development Bank Will Allow Solar Cell Imports to 2020

Brazil’s BNDES development bank will allow solar developers to import photovoltaic cells until 2020 as part of efforts to spur domestic solar manufacturing capacity.

Bloomberg Business Week
31/07/2014 14:57
Visualizações: 859 (0) (0) (0) (0)

Brazil’s BNDES development bank will allow solar developers to import photovoltaic cells until 2020 as part of efforts to spur domestic solar manufacturing capacity.

 

From 2020, local content rules will require developers to use components produced in Brazil to qualify for its low-cost financing, Antonio Carlos Tovar, head of renewable energy development for BNDES, said in an interview in Rio de Janeiro yesterday.

 

Brazil currently gets less than 1 percent of its electricity from solar power and has almost no domestic photovoltaic production. Banco Nacional de Desenvolvimento Economico e Social, the development bank’s formal name, used similar local-content rules to promote the wind industry.

 

The rules from BNDES and the country’s Energy Research Agency, known as EPE, have two parts. In the first phase, which runs through 2017, developers must use solar panels with locally produced frames and some electronic components. From 2018 through 2020, additional parts of the systems must be manufactured in Brazil.

 

After that they will need to use Brazilian cells, the most important part of the solar panel.

 

Manufacturers will have the “freedom to manage their own strategy” and choose what items to produce locally and which ones to import until 2020, according to Tovar. “It would be a great breakthrough if in this period we already had in fact the cell manufacturing in Brazil.”

 

Other Support

 

Panels represent about 40 percent of solar farms’ total investment, according to Pedro Vaquer, director of the Brazilian developer Solatio Energia. BNDES will also provide additional support for companies that use other locally manufactured equipment.

 

Financing for the plan will come from BNDES itself and a 560 million reais ($249 million) government fund to combat climate change known as the Fundo Clima. Tovar didn’t give details about the funding mix. The new local-content policy will be announced in mid-August, according to Tovar.

 

Brazil needs to install more than 500 megawatts of solar energy capacity a year to support local panel production, according to Helena Chung, a Sao Paulo-based analyst for Bloomberg New Energy Finance. “If BNDES wants the plant, the government also has to give a signal that it will create the demand.”

 

Solar Plan

 

Brazil is also planning its first national auction in October, with a separate category for contracts to sell power produced from sunlight. With the auctions, the country expects to contract 3.5 gigawatts of solar power between 2014 and 2018. That would have sunlight producing about 1.8 percent of the country’s energy by 2023, said Mauricio Tolmasquim, the head of EPE, in an interview in the beginning of July.

 

The plan depends on consumers being prepared to pay more for locally made panels, according to Markus Vlasits, the country manager of Yingli Green Energy Holding Co., the largest solar-panel maker.

 

“Brazil does not have competitive advantage for module manufacturing,” Vlasits said in an e-mail response to questions. “We estimate that local assembly would be 25 percent to 50 percent more expensive than in China.”

 

Most Read Today
see see
BOGE2026
ANP participates in Bahia Oil & Gas Energy 2026, in Salvador
25/05/26
Fenasucro
Future Fuel consolidates Brazilian pioneering role and b...
20/05/26
Partnership
Radix partners with Repsol Sinopec Brasil and PUCRS to c...
20/05/26
Communication
The behind-the-scenes story of communication and adverti...
20/05/26
Result
Total oil production under production-sharing regime hit...
20/05/26
BOGE2026
Global geopolitics’ impact on the local oil sector to be...
19/05/26
International Women's Day
IBP celebrates International Women at Sea Day and reinfo...
19/05/26
Pre-Salt
Mero Field in the Santos Basin Pre-Salt Receives Unprece...
14/05/26
Results
Petrobras reports net profit of R$ 32.7 billion in the f...
14/05/26
Partnership
Halliburton and Shape Digital establish strategic collab...
06/05/26
ROG.e 2026
ROG.e 2026 will bring together CEOs from TotalEnergies, ...
06/05/26
International
At OTC Houston 2026, Firjan SENAI SESI expands its reach...
06/05/26
International
At OTC Houston 2026, Firjan SENAI holds international ed...
04/05/26
Recognition
BRAVA Energia receives top global industry award for Atl...
04/05/26
International
Brazil reaffirms technological leadership at OTC Houston...
04/05/26
Pre-Salt
PPSA closes 2025 with a net profit of R$ 30.1 million
04/05/26
Results
With 5.531 million boe/d, Brazil continues with record o...
04/05/26
International
Brazil reaffirms technological leadership at OTC Houston...
02/05/26
Environment
Brazil appears among world's largest methane emitters in...
30/04/26
PPSA
Federal Government receives R$ 917.32 million from Tupi ...
07/04/26
Study
Brazil increases dependence on thermal power, but lack o...
07/04/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.