Discovery

Echidna-1 Exploration Well: 213 Metre Gross Oil Column Confirmed Testing to Commence Immediately

Karoon Gas Australia Ltd is pleased to announce that a 213 metre gross oil column has been confirmed in the Echidna-1 exploration well

Karoon Gas Australia/T&B Petroleum
20/04/2015 15:48
Visualizações: 993 (0) (0) (0) (0)

Karoon Gas Australia Ltd is pleased to announce that a 213 metre gross oil column has been confirmed in the Echidna-1 exploration well from wireline pressure data across the Paleocene and Maastrichtian aged reservoir intervals. Physical oil samples recovered measure a 39.5 degree API oil gravity.

 

As at 0800 hrs AEST on 20 April 2015, the Echidna-1 exploration well had completed the wireline program and was preparing for the commencement of a production testing program within the Paleocene reservoir section.

 

Karoon Managing Director Mr. Robert Hosking said, “The Echidna discovery represents another significant achievement for Karoon. Echidna adds incremental resource to Karoon’s discovered Kangaroo oil field which further supports Karoon’s ambitions to develop an integrated production hub in the Santos Basin”.

 

Wireline Results

 

The Paleocene reservoir interval has a gross thickness of 75 metres, 54 metres net, with an average porosity of 25%. Oil recovered from wireline MDT samples is 39.5 degree API with a GOR of 750 scf/bbl.

 

The Maastrichtian reservoir interval has a gross thickness of 113metres, 50 metres net, with an average porosity of 21%. A pressure defined oil gradient shows the Maastrichtian to have the same oil pressure gradient as the Paleocene reservoir, indicating that the oil API and GOR are very similar to the recovered Paleocene samples.

 

A deeper Maastrichtian oil column was also intersected in a separate 7 metre sand having an average 23% porosity. The interpretation of oil is supported by natural shows and a pressure-defined oil gradient.

 

The Echidna-1 exploration well is located in Block S-M-1102, on the east side of the “Emu” salt diapir complex, and tested a similar salt flank play first proven by Kangaroo-1 and later confirmed by Kangaroo-2 and its two sidetracks. Results of Echidna further substantiate the validity of the salt flank play.

 

The joint venture will conduct a production testing program over the Paleocene reservoir section which is set to commence as soon as preparations are complete, expected later this week. The Maastrichtian reservoir section is planned to be tested as part of the follow up drilling program.

 

A decision with respect to the second well option will be made in the coming weeks.

 

Forward Plan

 

Over the coming months Karoon will continue to conduct the required geoscience and engineering work to characterise the Kangaroo and Echidna oil fields. Further appraisal drilling is planned to commence in the near term with pre-FEED studies to be conducted in tandem with drilling.

 

Karoon holds a 65% interest in and is operator of the jointly held block S-M-1102, Santos Basin, Brazil. Pacific Rubiales Energy Corp. holds the remaining 35% working interest.

Most Read Today
see see
RD&I
ANP Holds Workshop on Private Equity Investment Fund (FIP)
23/07/25
Campos Basin
Petrobras announces Approval of the Production Individua...
23/07/25
ADIPEC 2025
ADIPEC 2025 Technical Conferences achieve record submiss...
22/07/25
People
BCCK names Andres Martinez as business development manager
21/07/25
Fenasucro
Brazil Holds Global Leadership in Renewable Cogeneration...
21/07/25
Results
Revap Achieves Historic Records in H1 with S10 Diesel an...
21/07/25
Solar Energy
Transpetro Inaugurates Solar Plant to Supply the Belém T...
21/07/25
Company News
Strohm completes successful field trials for Petrobras
16/07/25
Natural Gas
Gasmig: 39 Years of Energy, Innovation, and Commitment t...
16/07/25
Sustainability
Foresea earns Social Seal and reports significant result...
11/07/25
Results
Oil and Gas Sector Leads Dividend Distribution in 2024 w...
10/07/25
Natural Gas
Comgás Receives 41 Proposals in Public Call for Natural ...
10/07/25
People
Lucas Mota de Lima Appointed Executive Manager of ABPIP
10/07/25
Biomethane
Presidente Prudente (SP) Begins R$12 Million Biomethane ...
10/07/25
E&P
Hitachi Energy to evaluate electrification of offshore p...
10/07/25
Digitalization
TGS and Equinor Collaborate to Drive Digital Transformat...
10/07/25
People
Julia Cruz Appointed as New Secretary of Green Economy, ...
03/07/25
Sustainability
ABB among TIME’s World’s Most Sustainable Companies
03/07/25
Biofuels
Brazil Can Lead the Decarbonization of International Tra...
03/07/25
Pre-Salt
Oil States signs contracts to supply rigid jumpers for S...
03/07/25
Electric Energy
SMEs: Seven Tips for Joining the Free Energy Market
03/07/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2