Production

Highlights on Petrobras' production and sales in 2Q21

Petrobras Agency
30/07/2021 09:53
Highlights on Petrobras' production and sales in 2Q21 Imagem: Petrobras Agency Visualizações: 1989 (0) (0) (0) (0)

In 2Q21, Petrobras continued to operate safely and had a solid operating performance, despite the persistence of the pandemic scenario. The average production of oil, NGL and natural gas reached 2.80 MMboed, 1.1% above 1Q21, due to the continued ramp-up of platforms P-68 (Berbigão and Sururu fields) and P-70 (Atapu field). Production in the pre-salt area totaled 1.96 MMboed in the quarter, representing 70% of Petrobras' total production, 1 percentage point above 1Q21 and 4 percentage points above 2Q20.

 

Because of the pandemic, the company kept the headcount reduced on platforms, with the adoption of measures such as pre-shipment isolation and extensive testing, in addition to changing operational routines in order to preserve the health of our employees and reduce risks of contamination and impacts on production.

 

We highlight the following points in our operating performance:

 

• In June, we started the integrated operation of Routes 1 and 2 of the Santos Basin gas flow, close to the FPSO Cidade de Angra dos Reis, as a result of the beginning of the Integrated Gas Flow System contracts, allowing more flexibility due to better distribution of the production units connected to the system and boosting gas supply;

 

• In the same month, we started the gas flow from P-76 in Búzios, contributing to the exploitation of the field's potential and enabling better reservoir management and increased value generation;

 

• On July 5th, FPSO Carioca completed the journey to its final location, in the Sépia field, with subsequent start of mooring activities. The unit's first oil is expected in August 2021;

 

• P-68 and P-70 units continued to ramp-up and delivered high operational efficiency rates in the quarter. On July 18th, P-70 reached the maximum allowed production capacity, 161 kbpd. Thus, despite the pandemic, the ramp-up was concluded in less than 13 months, close to our average of 11 months in the last three years.

 

Click here to access the full report.

Most Read Today
see see
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
FIRJAN
Brazilian industry records four consecutive months witho...
03/09/25
Copel
EPE President presents future outlook for the power sector
03/09/25
FIRJAN
Together with CNI, Firjan launches business mission in t...
03/09/25
Gulf of America
C-Innovation completes successful decommissioning projec...
28/08/25
Equatorial Margin
Rig chartered by Petrobras arrives in Amapá to take part...
19/08/25
FIRJAN
Rio gains Firjan SENAI Metalworking Reference Center
19/08/25
RD&I
CEPETRO develops for Petrobras a tool that integrates mu...
19/08/25
Pre-Salt
Búzios Field surpasses the record level of 900 thousand ...
19/08/25
Logistics
PetroReconcavo and Dislub build an unprecedented oil out...
19/08/25
IBP
NAVE Program advances with 21 energy sector startups
19/08/25
International Event
The 3rd Annual World ReAM Show Returns to Dubai, Bridgin...
13/08/25
Sustainability
ATPI Expands Global Sustainability Portfolio with Brazil...
06/08/25
Results
ANP releases consolidated 2024 data in English for the r...
29/07/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2