Santos Basin

Lankhorst mooring lines for FPSO Cidade de Itaguai

The FPSO will be deployed to the Iracema Norte area.

LEB
06/02/2014 16:39
Lankhorst mooring lines for FPSO Cidade de Itaguai Imagem: TB Petroleum Visualizações: 1965 (0) (0) (0) (0)

 

Lankhorst Mooring Lines for FPSO Cidade de Itaguai
Lankhorst Euronete Brazil (LEB) has entered into a contract with SOFEC, Inc., to provide the complete supply of polyester lines for the mooring of FPSO Cidade de Itaguaí MV26.
SOFEC, a subsidiary of MODEC, Inc., has awarded LEB to produce the polyester spread mooring system based on LEB’s Cabral 512® production technology which will be installed at a water depth of 2,240 meters.
The FPSO will be deployed to the Iracema Norte area of the BM-S-11 block off the coast of Brazil in the fourth quarter of 2015, located approximately 300 km south of Rio de Janeiro, Brazil. The oil is contained in the pre-salt layer at approximately 5,000 meters beneath the seabed. The processing capability will be of 150,000 barrels of oil per day, 280 MM standard cubic feet of gas per day and a storage capacity of 1,600,000 barrels of total fluids.
"This new contract with SOFEC, confirms our ability to supply the Brazilian market with a high degree of technical and logistical advantages to our clients in Brazil", comments Rui Faria, Managing Director of LEB, "also strengthening our position as world market leaders in the production of deep water mooring fiber ropes".
The supply contract includes about 75,000 meters of Cabral 512®, with 1,200 tons of minimum breaking load.
Lankhorst Euronete Brazil (LEB), a WireCo® WorldGroup brand, specializes in the development and production of ropes for the maritime and offshore industry and is a leading supplier in many shipping and offshore markets throughout the world.

Lankhorst Euronete Brazil (LEB) has entered into a contract with SOFEC, Inc., to provide the complete supply of polyester lines for the mooring of FPSO Cidade de Itaguaí MV26.


SOFEC, a subsidiary of MODEC, Inc., has awarded LEB to produce the polyester spread mooring system based on LEB’s Cabral 512® production technology which will be installed at a water depth of 2,240 meters.

 

The FPSO will be deployed to the Iracema Norte area of the BM-S-11 block off the coast of Brazil in the fourth quarter of 2015, located approximately 300 km south of Rio de Janeiro, Brazil. The oil is contained in the pre-salt layer at approximately 5,000 meters beneath the seabed. The processing capability will be of 150,000 barrels of oil per day, 280 MM standard cubic feet of gas per day and a storage capacity of 1,600,000 barrels of total fluids.

 

"This new contract with SOFEC, confirms our ability to supply the Brazilian market with a high degree of technical and logistical advantages to our clients in Brazil", comments Rui Faria, Managing Director of LEB, "also strengthening our position as world market leaders in the production of deep water mooring fiber ropes".

 

The supply contract includes about 75,000 meters of Cabral 512®, with 1,200 tons of minimum breaking load.

 

Lankhorst Euronete Brazil (LEB), a WireCo® WorldGroup brand, specializes in the development and production of ropes for the maritime and offshore industry and is a leading supplier in many shipping and offshore markets throughout the world.

Most Read Today
see see
ADIPEC 2025
ADIPEC 2025 Day 3: Energy, finance and technology leader...
07/11/25
Results
Petrobras reaches net income of R$ 32.7 billion in the t...
07/11/25
Cop30
IBP Advocates Global Criteria for a Just Energy Transition
07/11/25
Offshore
Decommissioning Takes Center Stage
07/11/25
Natural Gas
ANP Approves Action Plan on Gas Pipeline Transportation ...
07/11/25
ADIPEC 2025
AI is no longer a side project: Technology leaders at AD...
05/11/25
Environment
ANP Holds Workshop on Methane Emissions in Partnership w...
05/11/25
International Event
International Energy Event Opens Registration for Activities
05/11/25
RD&I
Norway and Brazil Launch New Joint Research Funding Call...
05/11/25
Partnership
DeepOcean and Jana Marine enter Saudi Arabia subsea part...
04/11/25
ADIPEC 2025
ADIPEC 2025: Industry calls for policy pragmatism, embra...
04/11/25
ADIPEC 2025
Johnson Matthey: Leadership and Innovation Driving the G...
31/10/25
OTC Brasil 2025
OTC Brazil connects the Equatorial Margin’s potential to...
30/10/25
OTC Brasil 2025
New Version of ANP’s Greenhouse Gas Emissions Dynamic Da...
30/10/25
OTC Brasil 2025
Port of Açu and IKM Advance Partnership to Create Brazil...
30/10/25
OTC Brasil 2025
Port of Açu and SISTAC Sign Agreement to Provide Decommi...
29/10/25
Royalties
Royalties from August Production Distributed to States a...
29/10/25
OTC Brasil 2025
iUP Innovation Connections Links Innovation Strategy to ...
29/10/25
ANP
Permanent Production Sharing Offer: Registered Companies...
29/10/25
OTC Brasil 2025
Firjan Showcases Technology and Innovation Solutions for...
29/10/25
OTC Brasil 2025
O&G exploration is key to social development and a just ...
28/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.