Companies

Lukoil achieves offshore Caspian early installation targets

Development drilling should also start next year, with first oil slated for the end of 2015.

Lukoil
17/12/2013 20:19
Visualizações: 863 (0) (0) (0) (0)

 

Assembly has been completed of bearing blocks for the main offshore installations at Lukoil’s Vladimir Filanovsky field in the Russian sector of the Caspian Sea.
These are the ice-resistant stationary platform, the central processing platform, the living quarters module platform, and the riser block.
A transport/installation barge with a 400-ton capacity crane fixed the bearing blocks to the seafloor via piles of more than 2 m (6.5 ft) dia. and wall thickness of up to 80 mm (3.1-in.), driven to a depth of 60 m (197 ft). The piles are designed to withstand extreme ice and wave loads.
Additionally, 77 km (48 mi) of subsea oil pipeline and 61 km (38 mi) of subsea gas pipeline have been installed, along with 40 km (25 mi) of inter-field oil pipelines and 40 km of inter-field gas lines, connecting V.Filanovsky with the producing Yu.Korchagin field.
In 2014, topside sections will be mounted on the bearing blocks, and construction will start of onshore gas pipelines to the Stavrolen petrochemical enterprise in Budennovsk, and an oil pipeline to oil intake facilities close to the Komsomolskaya oil pumping station owned by the Caspian Pipeline Consortium.
Development drilling should also start next year, with first oil slated for the end of 2015.

Assembly has been completed of bearing blocks for the main offshore installations at Lukoil’s Vladimir Filanovsky field in the Russian sector of the Caspian Sea.These are the ice-resistant stationary platform, the central processing platform, the living quarters module platform, and the riser block.


A transport/installation barge with a 400-ton capacity crane fixed the bearing blocks to the seafloor via piles of more than 2 m (6.5 ft) dia. and wall thickness of up to 80 mm (3.1-in.), driven to a depth of 60 m (197 ft). The piles are designed to withstand extreme ice and wave loads.


Additionally, 77 km (48 mi) of subsea oil pipeline and 61 km (38 mi) of subsea gas pipeline have been installed, along with 40 km (25 mi) of inter-field oil pipelines and 40 km of inter-field gas lines, connecting V.Filanovsky with the producing Yu.Korchagin field.


In 2014, topside sections will be mounted on the bearing blocks, and construction will start of onshore gas pipelines to the Stavrolen petrochemical enterprise in Budennovsk, and an oil pipeline to oil intake facilities close to the Komsomolskaya oil pumping station owned by the Caspian Pipeline Consortium.


Development drilling should also start next year, with first oil slated for the end of 2015.

 

Most Read Today
see see
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
Offshore Operations
Crew training and connectivity are the true enablers of ...
23/12/25
Recognition
IBP Wins the “Events Oscar” Once Again with ROG.e 2024
11/12/25
FIRJAN
Rio Could Generate 676,000 New Jobs by Stimulating Nine ...
11/12/25
Inland Navigation
Grease-Free Revolution in Latin America’s Workboat Sector
10/12/25
PPSA
Production-Sharing Contracts to Produce 2 Million Barrel...
10/12/25
Recognition
National Public Transparency Program Grants Transpetro I...
10/12/25
Logistics
Transpetro expands its logistics operations with the int...
09/12/25
Auction
PPSA raises around R$ 8.8 billion from the sale of the F...
08/12/25
PPSA
Petrobras announces results of PPSA’s Non-Contracted Are...
08/12/25
Niterói
Niterói concludes second edition of Tomorrow Blue Econom...
02/12/25
Recognition
ABS Consulting Earns Third Elev8 GovCon Honor for Excell...
22/11/25
Award
Aed Energy Wins at the 2025 Energy Storage Awards
22/11/25
Mossoró Oil & Gas Energy 2025
PetroSupply Meeting to Boost Business at Mossoró Oil & G...
21/11/25
Results
Union’s Oil Production Reached 174 Thousand Barrels per ...
21/11/25
International Company News
TGS Extends Agreement with the Government of the Federal...
21/11/25
Company News
Belga Marine and Global Maritime Announce Strategic Part...
21/11/25
Niterói
Tomorrow Blue Economy sets Niterói in motion in the coun...
13/11/25
Cop30
ANP Participates in the Event and Advances Measures for ...
13/11/25
FIRJAN
Enaex 2025 Discusses Reindustrialization, Brazil’s Compe...
13/11/25
Mossoró Oil & Gas Energy 2025
Mossoró Oil & Gas Energy to Feature Strategic Debates in...
13/11/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.